Architecting the era of autonomous agency
08
Transformation

Migration & Modernization

Escape legacy without disruption.

Assess8sPlan1m 42sReplicate51sValidate5m 10sCutoverlive
Downtimenear zeroRollbackalways readyParallel run2 weeks

A workload moving without downtime

Capabilities_Matrix

Precision engineering for migration & modernization demands a specialized toolkit.

01

Legacy System Assessment

Technical deep-dive into your current architecture — documenting dependencies, risks, and modernization options.

02

Zero-Downtime Migration

Blue-green deployments and strangler fig patterns that keep your business running throughout the migration.

03

Database Migration

Oracle to PostgreSQL, MSSQL to Aurora, and other database migrations with full data integrity validation.

04

Framework Modernization

Upgrade from Java EE to Spring Boot, .NET Framework to .NET 8, and other outdated runtime environments.

Deployment Protocol

Zero-downtime migration from legacy systems to modern cloud-native architectures, frameworks, and databases.

Legacy assessment
Zero-downtime migration
Database migration
Framework modernization
Parallel testing
Rollback planning

Operational Tech_Stack

AWS DMSDebeziumTerraformDockerKubernetesk6PostgreSQLGitHub Actions

What makes this hard

Nobody left is sure what the system actually does.

01

Behaviour that exists only in code

Undocumented rules accumulated over decades are load-bearing, and no current employee can enumerate them.

02

Big-bang cutover risk

A single switch with no incremental proof concentrates all the risk into one irreversible night.

03

Data that will not reconcile

Legacy stores carry decades of exceptions and corrections that a naive migration silently drops.

04

Parallel running cost

Running old and new together is necessary and expensive, so the overlap must be planned and time-boxed.

Common questions

Before you
get in touch.

How do you handle undocumented behaviour?

We characterize the existing system from its real inputs and outputs and build a test suite from observed behaviour, so the replacement can be proven against what actually happens.

Can we migrate incrementally?

Almost always, and we prefer it. Routing a slice of traffic to the new path and comparing results de-risks far more than any amount of pre-cutover testing.

What about the data?

Reconciliation is the hard part, not movement. We agree what must match, to what tolerance, before anything is moved.

Will there be downtime?

Usually minimal and planned. Where the architecture allows, we cut over with the old path still available to fall back to.

Do we have to replace everything?

No, and often you should not. Some legacy systems are stable and cheap to run; the case for replacement has to be made per system, not per estate.

Ready to integrate?

Begin your transformation with our specialized migration & modernization engineering team.

Let's build what's next.

Tell us what you are working on, and we will show you where to start.

Talk to us